(3.95 points)
Rationale
Provide or connect to multi-use trails or greenways.
Strategy Requirements
Include a multi-use trail(s) or greenway(s) within the project boundary that is:
- free of charge to all regular occupants
- exclusively for non-vehicular use
- accessible by sidewalks or bicycle lane
- a minimum of 1 mile or 1600 meters in length
- shielded from other functions by a natural buffer
Alternative Compliance
The qualifying multi-use trail(s) is located within 1/2 mile or 800 meters walking distance from the project boundary.
Design Certification
Submit the following:
- An official or draft statement confirming that the trail will be free of charge to all regular occupants
- Annotated map(s) or plan(s) detailing that the trail will be:
- exclusively for non-vehicular use
- accessible by sidewalks or bicycle lanes
- a minimum of 1 mile of 1600 meters in length
- located within one of the following:
- the project boundary
- 1/2 or 800 meters from the project boundary (Alternative Compliance only)
- Design drawings detailing the existing or planned natural buffer
Built Certification
Submit the following:
- An official statement confirming that the trail is free of charge to all regular occupants
- Annotated map(s) or plan(s) detailing that the trail is:
- exclusively for non-vehicular use
- accessible by sidewalks or bicycle lanes
- a minimum of 1 mile of 1600 meters in length
- located within one of the following:
- the project boundary
- 1/2 or 800 meters from the project boundary (Alternative Compliance only)
- A minimum of 3 photographs detailing the natural buffer
Comments
0 comments
Please sign in to leave a comment.