(2 points)
Purpose
Minimize ecological disturbance caused by mass grading and protect groundwater from sedimentation or siltation caused by construction site runoff.
Criteria
Begin construction of buildings and infrastructure within six (6) months of any disturbance of vegetated areas.
Verification
- Grading plan clearly indicating phased development.
- Inspection by an ECC Technical Advisor.
Comments
0 comments
Please sign in to leave a comment.