(2 points)
Purpose
Reuse existing non-residential structures and improve energy efficiency.
Criteria
Meet current Energy Code for all lighting, HVAC and building envelope systems; excluding wall assembly requirements.
OR
Conduct an ASHRAE energy audit that includes energy cost savings and estimated cost for recommendations. Implement all suggested measures with a 5 year payback period.
Commercial buildings listed on the National Registry of Historic Places or similar listing will qualify for this point.
Verification
- Signed scope of work for Energy Code upgrades.
- Energy Audit Report.
- Narrative of pursued recommendations.
Comments
0 comments
Please sign in to leave a comment.