Documentation of the Basis of Design (BOD) is a step required for compliance with CALGreen Code, Section 5.410.2.2, for newly constructed buildings greater than 10,000 square feet. This template is a guide for use by the design team.
- Renewable Energy Systems
- Narrative Description of System
- [System type(s), location, inverter type, control type, performance, efficiency, energy savings, payback period]
- [Describe how system meets any special requirements listed in the Owner's Project Requirements document.]
- Reasons for System Selection
[Reasons that the selected renewable energy systems are a better choice than alternatives (e.g., performance, efficiency, reliability, flexibility, simplicity, expandability, cost, payback period, utility company incentives, owner preference, space constraints, cost, owner preferences, ease of maintenance, etc.)] - Renewable Energy System Generation Calculations
[Describe sizing calculation method, assumptions, and results]
- Narrative Description of System
- Landscape Irrigation Systems
- Narrative Description of System
- [System type(s), location, control type, performance, efficiency, water savings]
- [Describe how system meets any special requirements listed in the Owner's Project Requirements document.]
- Reasons for System Selection
[Reasons that the selected landscape irrigation systems are a better choice than alternatives (e.g., performance, efficiency, reliability, flexibility, simplicity, expandability, cost, payback period, utility company incentives, owner preference, cost, owner preferences, ease of maintenance, etc.)] - Landscape Irrigation System Calculations
[Describe sizing calculation method, assumptions, and results]
- Narrative Description of System
- Water Reuse Systems
- Narrative Description of System
- [System type(s), location, space requirements, equipment requirements, control type, performance, efficiency, potable water savings, payback period]
- [Describe how system meets any special requirements listed in the Owner's Project Requirements document.]
- Reasons for System Selection
[Reasons that the selected water reuse systems are a better choice than alternatives (e.g., performance, efficiency, reliability, flexibility, simplicity, expandability, cost, payback period, utility company incentives, owner preference, space constraints, cost, owner preferences, ease of maintenance, etc.)] - Water Reuse System Calculations
- Narrative Description of System
COMPLIANCE CHECKLIST
[Describe sizing calculation method, assumptions, and results]
INCORPORATE THIS FORM IN THE PLANS
Project Address: _________________________________________________________
Permit Number: _____________________________
ITEM # | BOD ITEMS | PAGE NUMBER IN BOD DOCUMENT |
---|---|---|
RENEWABLE ENERGY SYSTEMS (IF ANY) | ||
1 | Narrative description of system (i.e., system type(s), location, inverter type, control type, performance, efficiency, energy savings, payback period, other) | |
2 | Description of how the system meets requirements listed in OPR | |
3 | Reasons for system selection, as opposed to alternatives (e.g., performance, efficiency, reliability, flexibility, simplicity, expandability, cost, payback period, etc.) | |
4 | Renewable energy system generation calculations: sizing calculation method, assumptions, and results | |
LANDSCAPE IRRIGATION SYSTEMS | ||
5 | Narrative description of system (i.e. system type(s), location, control type, performance, efficiency, water savings, other) | |
6 | Description of how the system meets requirements in OPR | |
7 | Reasons for system selection, as opposed to alternatives (e.g., performance, efficiency, reliability, flexibility, cost, utility company incentives, etc.) | |
8 | Landscape irrigation system calculations: sizing calculation method, assumptions, and results | |
WATER REUSE SYSTEM (IF ANY) | ||
11 | Narrative description of system (i.e., system type(s), location, space requirements, equipment requirements, control type, performance, efficiency, potable water savings, payback period, other) | |
12 | Description of how the system meets requirements in OPR | |
13 | Reasons for system selection, as opposed to alternatives (e.g., performance, efficiency, reliability, flexibility, simplicity, cost, payback period, etc.) | |
14 | Water reuse system calculations: sizing calculation method, assumptions, and results |
Architect/Engineer/Designer Acknowledgement | ||||
---|---|---|---|---|
I hereby acknowledge the Basis of Design (BOD) document has been completed and meets the Owner's Project Requirements (OPR). | ||||
Name | License Number | Signature | Date | |
Architect of Record | ||||
Landscape Architect | ||||
Renewable Energy System Designer | ||||
Other (specify): |
Commissioning Agent Acknowledgment | |
---|---|
I have reviewed the Basis of Design (BOD) and verified that it meets the Owner's Project Requirements (OPR): | |
Name: _______________________________ | |
Company Name (if applicable): _______________________________ | |
Agent's Signature: _______________________________ | Date: ___________ |
Copyright © 2021 State of California