1. Scoring
In partnership with the development team, complete the “Scoring” worksheet to reflect green practices pursued. Include a brief description of the development within the “Description” field on the “Start Here” worksheet.
2. Registration
Register the project.
3. Verification Notification
Notify Home Innovation of the first verification visit/review as soon as it is scheduled. If multiple visits are required, include the first date on the inspection notification.
4. Letter of Approval Verification (optional)
Review plans and other documentation to confirm that selected green practices are reflected. Award points on the “Letter of Approval Verification” worksheet. When completing the review, assume that construction will follow the plans. Include any explanatory notes in the “Verifier Notes/Comments” column. Where an explanation is required, the cell will flag yellow. Notes provided by the developer will appear in the right-hand column for reference.
5. Final Verification
Perform on-site verification and documentation review. Multiple visits may be required during construction to award some practices.
Award points using the “Completed Dev. Verification” worksheet. For each item, include the verification date in the “Verification Date(s)” column. Include any explanatory notes in the “Verifier Notes/Comments” column. Where an explanation is required, the cell will flag yellow. Notes provided by the developer will appear in the right-hand column for reference.
6. Submission of Verification Packet (for either Letter of Approval or Certification)
Submit completed verification report, copy of signed signature pages, and copy of the development plans (general layout is sufficient) to Home Innovation. At completion, please also include a photo of the main entrance of the development.
© 2020 Home Innovation Research Labs, Inc. All rights reserved.
Comments
0 comments
Please sign in to leave a comment.