(Additional; Building-specific or Installation-wide)
- Has building-level or centralized renewable energy generation been evaluated?
- When found to be LCCE, has renewable energy generation been implemented or planned for implementation?
Implement renewable energy generation projects on agency property for agency use, where lifecycle cost effective and when there are no adverse effects on base-wide electrical system (grid) power quality or mission. Implementation must comply with the requirements in UFC 3-440-01. When available, utilize Installation-specific studies to determine LCCE of renewable sources. Studies must be dated within five years of project design start.
Components may choose centralized renewable energy development in lieu of building by building application. Meet the requirements of UFC 3-540-08.