Applicable to:
- Cities and Utilities (1 point)
- Campuses (1–2 points)
- Transit (1–2 points)
INTENT
To enable and motivate users to choose and invest in preferred generation sources.
REQUIREMENTS
All Projects
Offer supply choice by providing more than one power supplier option to at least 50% of tenants or customers (campuses) or all customer classes (cities and utilities) (1 point).
Campuses and Transit
Opt in to preferred electric supply (1 point).
CASE 1. Supply choice available
Participate in a supply choice program and select an option that performs better than the state or regional average for at least one of the following measures:
- Renewables content
- Reliability performance
- Power quality performance
OR
CASE 2. Supply choice not available
Discuss participation in future supply choice programs with grid operators.
© Copyright 2020 GBCI. All Rights Reserved.
Comments
0 comments
Please sign in to leave a comment.