(1-5 points)
Applicable to: Cities & Utilities, Campuses, Transit
INTENT
To improve reliability and resilience by providing an alternative source of electricity supply and transfer controls.
REQUIREMENTS
All projects
OPTION 1. Alternative supply (2 points)
Have in place provisions for alternative sources of power supply for at least 40% or 80% of the project load in case the primary power supply fails. Choose one or more of the following:
- Alternative (or secondary) feeder from bulk grid
- Generation outside the project boundary (at the neighborhood level)
- Project-owned or project-operated backup power system
Calculate the fraction of the project load, including all critical loads that is protected by backup power supply options. Points are awarded according to Table 1.
Table 1. Points for alternative supply
Project load with backup power supply (%) | Points |
≥ 40 | 1 |
80 | 2 |
AND/OR
OPTION 2. Transfer controls (1–3 points)
Demonstrate advanced capability to transfer control from grid-connected mode to complete or partial island mode and back again. Points are awarded according to Table 2.
Table 2. Points for transfer controls
Transfer Capability | Points |
Automatic and quick transfer | 1 |
Seamless transfer | 2 |
Ride-through | 1 |