(3 points)
INTENT
SUMMARY
ISSUE
SOLUTIONS
IMPACT
REQUIREMENTS
Design Aesthetic Circulation Networks (1 point)
Verified by Owner, Photographic evidence
Hallways within the project boundary are aesthetically designed through the inclusion of at least two of the following per floor:
-
Music.
-
Artwork.
-
Light levels of at least 215 lux [20 fc] when in use.
-
Views of an interior atrium, courtyard or daylight via windows or skylights.
-
Natural design elements (e.g., plants, water features, images of nature).
-
Gamification.
At least one staircase or other active path between floors (e.g., ramps) is open to regular building occupants, services all floors of the project and is and aesthetically designed through the inclusion of at least two of the following per floor:
-
Music.
-
Artwork.
-
Light levels of at least 215 lux [20 fc] when in use.
-
Views of an interior atrium, courtyard or daylight via windows or skylights.
-
Natural design elements (e.g., plants, water features, images of nature).
-
Gamification.
Integrate Point-of-Decision Signage (1 point)
Verified by Owner, Photographic evidenceProjects implement point-of-decision signage that encourages stair use at each of the following locations within the project boundary (minimum of one sign per location):
-
Elevator banks or other modes of motorized vertical circulation (e.g., escalators).
-
Base of stairs/stairwells and re-entry points at each floor.
-
Junctions in corridors that lead to either a stairwell open to regular building occupants or an elevator bank (or other modes of motorized vertical circulation).
Note: Projects should consider primary language(s) spoken by the local population when creating signage.
Promote Visible Stairs (1 point)
Verified by Architectural Drawing
At least one staircase or other path between floors (e.g., ramps) meets the following requirements:
-
Open to regular building occupants.
-
Services all floors of the project.
-
Located physically and/or visibly before any motorized vertical circulation (e.g., elevator or escalator), as measured from the main point of entry to the project or building.
Comments
0 comments
Please sign in to leave a comment.